Pre-engineered Metal Buildings

DFW Connector Maintenance Shop, Grapevine, Texas(22,800 Sqf of pre-engineered metal building)

DFW Connector Maintenance Shop, Grapevine, Texas(22,800 Sqf of pre-engineered metal building)

Sabre Plant after construction(2008)

Sabre plant before construction(2007)

Sabre Manufacturing Building (156,000 Sqft , 4.5 Million during steel construction).

Sprint Press( 23,000 Sqft. Add on, 1.6 Million)

Sabre, Alvarado Texas, Gavanizer (48,000 Sqft, 3.8 Million)

Palm Harbor, Burleson Texas. (Final finish expansion, there were many jobs at this site)

Redman Homes Plant #2, Burleson Texas. (Raising 200 ft. rafter, 120.000 Sqft.)

Chevorlet RV center(framing) Burleson Texas(1.5 Million)

Second Baptist Church, Baytown Texas( Steel Erected $800,000)

Second Baptist Church, Baytown Texas( Steel Erected $800,000)

Second Baptist Church, Baytown Texas( Steel Erected $800,000)

Graywire line, Cresson, Texas(13,590 Sqft., $663,000)

Hoss Equipment Mechanical Building

Johnson County Pct 3($350,000)

2000 TBSA Building of the year, Clifco Sales, Burleson Tx. (9,000 Sqft $375,000)

Sprint Press( 23,000 Sqft. Add on, 1.6 Million)